SWOT analysis



 Topic: The design and construction of a bridge to span a creek with a width of about 20 metres.
 Location: Could be any (for example a park etc).

Word Limit: 1000 Words

The report should include the following:

SWOT analysis: discussing strength, weakness, opportunity and threats of the project in terms of technical, economical and environmental aspects.
Marking Criteria: Sample (HD)

Swot Analysis: Insightful analysis regarding all three technical, economical and environmental aspects.Comprehensive analysis in the context of the project.